The complete list of rehabilitation works

Attention: open in a new window. PDFPrintE-mail

Last Updated (Monday, 18 January 2016 17:00) Written by Administrator Sunday, 06 March 2011 17:29

A total of 51 rehabilitation works (encompassing different phases listed under each entry: FS – feasibility study; EI – emergency interventions project; BPD –building permit documentation, TD – technical documentation, ED – execution details; tender documentations are not listed separately), of which 18 buildings included on the Romanian national list of historic monuments (9 – A-list, 9 – B-list), distributed in 10 counties (over 28 settlements);

(49-51) 2009    Structural rehabilitation and general repairs of the "Bethlen Gábor" college, Aiud, Alba county;, Building C1 – main building – eastern wing; Building C2 – main building – southern wing; Building C3 – elementary school; Building C4 – dormitory; (AB-II-m-A-00171);
IROD M no.: 57/2009 – load-bearing structure design; phases: FS+ studies (01.2009); load-bearing structure head designer;
Principal design company: M & M Design Co.Ltd.; (No. 1/2009);
Beneficiary: Aiud Local Council; Owner: Reformed Diocese of Transylvania; User beneficiary: "Bethlen Gábor" College.

 

(48) 2008-    Emergency interventions – structural rehabilitation of the extension area of house no. 19, Rimetea, Alba county (vernacular building no. AB-II-s-A-00268, Rimetea rural site);
IROD M no.: 73/2008 – Principal design company and load-bearing structure designer; phases: EI – single phase (10.2008), execution in progress, mostly completed; project head and load-bearing structure head designer;
Beneficiary: Transylvania Trust Foundation, Cluj-Napoca, Owner: Fejér Csilla.

 

(47) 2008-    Rehabilitation, retrofitting, extension and mansarding of house on Calarasilor street no. 80; Târgu-Mures, Mures county, (in the protected area);
IROD M no.: 70/2008, load-bearing structure design; phases: BPD (10.2008) + TD+ED (02.2009); execution being initiated, load-bearing structure head designer;
Principal design company: Studio Kim Bucsa Diaconu Co.Ltd.; (No. 6/2008);
Beneficiary: AS CONCEPT Co.Ltd., Târgu-Mures.

 

(46) 2008    Restoring and retrofitting as Multifunctional Art Centre of the Dej synagogue – Dej, Cluj county (CJ-II-m-B-07603);
IROD M no.: 45/2008 – load-bearing structure design; phases: FS (07.2008), TD+ED and BPD excerpt (12.2008), handover in progress; load-bearing structure head designer;
Principal design company: PLANWERK Co.Ltd. Architecture + Urban Planning; (No. U065CJ / primary contract: 12091/09.05.2008)
Beneficiary: Dej Mayor's Office, 1 Mai street no. 2., Dej, Cluj county; Owner: Dej Orthodox Jewish Community.

 

(45) 2008-    Extending the extant building on I. M. KLEIN street no. 17, Cluj-Napoca, Cluj county, (in the protected area);
IROD M no.: 66/2008, load-bearing structure design; phases: BPD + TD+DE; failed in BPD phase, load-bearing structure head designer;
Principal design company: Studio Kim Bucsa Diaconu Co.Ltd.; (No. 2/2008);
Beneficiary: Erdélyi Hiradó Publishing Co.Ltd.., Cluj-Napoca.

 

(44) 2008    Emergency interventions – renovation and retrofitting of the Bancu Roman-Catholic church mortuary (Ciucsângeorgiu, Harghita county) (HR-II-m-A-12778.02);
IROD M no.: 62/2008 – load-bearing structure design; phases: EI (04.2008), the execution has not been started yet; load-bearing structure head designer;
Principal design company: VALLUM Co.Ltd., Miercurea-Ciuc; (No. 177/2006)
Beneficiary: Ciucsângeorgiu Roman-Catholic Parish, Harghita county.

 

(43) 2008    Architectural and structural rehabilitation, mansarding and extending the house on Podul Viilor street no. 9, Baia Mare, Maramures county (in the protected area);
IROD M no.: 58/2008 – load-bearing structure design; phases: BPD (09.2008) TD+ED (10.2008), the execution has not been started yet; load-bearing structure head designer;
Principal design company: Futo Studio Co.Ltd., Baia Mare;
Beneficiary: Liviu and Georgeta CONTIU.

 

(42) 2008    Structural and architectural retrofitting of the Unitarian church and enclosure wall, Badeni village, Moldovenesti, Cluj county; (CJ-II-m-B-07521);
IROD M no.: 56/2008 – Principal design company and load-bearing structure designer; phases: FS (05.2008) + studies; finalisation in progress; project head and load-bearing structure head designer;
Beneficiary: Badeni Unitarian Parish, Cluj county.

 

(41) 2008-    The “Village Life Museum”. Restoration and new use of the Bánffy Castle Mill, Bontida, Cluj county (CJ-II-m-A-07534.04);
IROD M no.: 67/2008 – load-bearing structure design; phases: FS: 05.2008); load-bearing structure head designer;
Principal design company: PLANWERK Co.Ltd. Architecture + Urban Planning;
Beneficiary: Transylvania Trust Foundation, Cluj-N, building in concession from the Romanian government through the Bontida Local Council, Cluj county.

 

(40) 2007-08    Structural and architectural rehabilitation of the Sic Reformed church and enclosure, Cluj county; (CJ-II-m-A-07759);
IROD M no.: 55/2007 – Principal design company and load-bearing structure designer; phases: FS (05.2008); BPD (05.2008); project head and load-bearing structure head designer;
Beneficiary: Reformed Diocese of Transylvania; User beneficiary: Sic Reformed Parish.

 

(39) 2007    Refurbishment and reparations of the house on Republicii street no. 57, Cojocna, Cluj county (19-20th c. vernacular building);
IROD M no.: 51/2007 – Principal design company and load-bearing structure designer; phases: TD+ED single phase (05.2008), execution in progress, mostly completed; project head and load-bearing structure head designer;
Beneficiary: Szabó Erzsébet.

 

(38) 2007    Campus for the Cadea School (Sacuieni, Bihor county); School building C1 – new slab over the 1st floor / new roof structure; School building C3 – new roof structure; Dormitory – roof structure repairs (extant, 20th century buildings);
IROD M no.: 44/2007 – load-bearing structure design; phases: TD+ED and BPD excerpt (11.2007), the execution has not been started yet; load-bearing structure head designer;
Principal design company: Consard Proiectare Co.Ltd.;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Bihor County School Inspectorate (No. 183-2/2007);

 

(37) 2007    Campus for the Borsa School of Arts and Crafts, Maramures county (extant, 20th century building);
IROD M no.: 43/2007 – load-bearing structure design; phases: TD+ED and BPD excerpt (10.2007), the execution has not been started yet; load-bearing structure contributor;
Principal design company: Consard Proiectare Co.Ltd.;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Maramures County School Inspectorate;

 

(36) 2006    Emergency interventions – Replacement of the decayed masonry arch with a special timber framed structure within the reformed church in Sic, Cluj county; (CJ-II-m-A-07759);
IROD M no.: 32/2006 – load-bearing structure design; phases: EI; load-bearing structure head designer;
Principal design company: M & M Design Co. Ltd.;
Beneficiary: Reformed Diocese of Transylvania; User beneficiary: Sic Reformed Parish.

 

(35) 2006-    Rehabilitation of the Reformed Church of Cluj-Napoca, Kogalniceanu street no. 18; (CJ-II-m-A-07380);
IROD M no.: 41/2006 – load-bearing structure design; phases: studies, BPD preparation (11.2007), BPD and TD+ED under preparation; load-bearing structure head designer;
Principal design company: M & M Design Co.Ltd.;
Beneficiary: Reformed Diocese of Transylvania; User beneficiary: Downtown Cluj Reformed Parish;

 

(34) 2006-2008    The New York Galleries, Cluj-Napoca: building rehabilitation, change of functions, repartition of extant spaces, attic furbishment, facade restoration – Napoca street no.1., Cluj-Napoca;
IROD M no.: 40/2006 – load-bearing structure design; phases: BPD (01.2007; TD+ED (02,2008), finalised, tender preparation in progress; project head and load-bearing structure head designer;
Principal design company: TEKTUM Arhitectura & Arta Co.Ltd.;
Beneficiary: ARDELEANA Co., Alba Iulia;

 

(33) 2007-2008    Structural and architectural retrofitting of the workshop buildings of the Special School for Hearing Disorders no. 2. – Gruia street no. 51, Cluj-Napoca;
IROD M no.: 38/2007 – Principal design company and load-bearing structure designer; phases: FS (06.2007; updated 06/2008), finalised; project head and load-bearing structure head designer;
Beneficiary: Special School for Hearing Disorders no. 2., Cluj-Napoca; public domain of the Cluj County Council;

 

(32) 2007    Furbishment of Deco Center Co.Ltd. – Iuliu Maniu street no. 2, Cluj-Napoca;
IROD M no.: 36/2007 – load-bearing structure design; phases: TD+ED (03.2007), finalised, the work has been abandoned in this form; load-bearing structure head designer;
Principal design company: KonZOL Studio Co.Ltd.;
Beneficiary: Deco Center Co.Ltd., Cluj-Napoca;

 

(31) 2006    Rehabilitation, retrofitting and consolidation of house no. 342, Rosia Montana, Alba county;
IROD M no.: 37/2006 load-bearing structure design; phases: BPD, TD+ED (11.2006), finalised, the work has not been started yet; load-bearing structure head designer;
Principal design company: General Game Co.Ltd.; Sântimbru;

 

(27-30) 2006    School Infrastructure Rehabilitation Programme – Rural Schools, Cluj county (all with historic character) S/SRIP/RFP/233/2006 Cluj; consisting of: Project no. 147-4/2006: Retrofitting and consolidation of the old building of the Cuzdrioara Agricultural School (Cuzdrioara, Cluj county), Project no.: 148-4/2006:Retrofitting and consolidation of the building of the Margau School with Classes I-VIII (Margau, Cluj county); Project no.: 149-4/2006: Retrofitting and consolidation of the old building of the Ploscos School with Classes I-VIII (Ploscos, Cluj county(; Project no.: 150-4/2006: Retrofitting and consolidation of the old building of the „Ady Endre” School with Classes I-VIII, Sâncraiu, Cluj county
IROD M no.: 34b/2006 load-bearing structure design; phases: FS / BPD + TD+ED (06-08.2006), finalised, works executed; load-bearing structure head designer;
Principal design company: Consard Proiectare Co.Ltd.;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Cluj County School Inspectorate;

 

(23-26) 2006    School Infrastructure Rehabilitation Programme – Rural Schools, Bihor county (all with historic character) S/SRIP/RFP/232/2006 Bihor; consisting of: Project no.: 145-4/2006: Retrofitting and consolidation of the old building of the Tileagd School with Classes I-VIII, comuna Tileagd Bihor county, Project no.: 144-4/2006: Retrofitting and consolidation of the Chijic School with Classes I-VIII (Copacel, Bihor county); Project no.: 145-4/2006: Retrofitting and consolidation of the old building of the Talpos School with Classes I-VIII (Batar, Bihor county); Project no.: 146-4/2006: Retrofitting and consolidation of the old building of the Balnaca School with Classes I-VIII (Suncuius, Bihor county);
IROD M no.: 34a/2006, load-bearing structure design; phases: FS / BPD + TD+ED (06-08.2006), finalised, execution in progress, load-bearing structure head designer;
Principal design company: Consard Proiectare Co.Ltd.;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Bihor County School Inspectorate;

 

(22) 2006    Structural retrofitting and extension by mansarding of the former Jewish cultural centre, Târgu Mures (MS-II-m-B-15526);
IROD M no.: 31/2006, load-bearing structure design; phases: BPD + TD+DE; failed in BPD phase, load-bearing structure head designer;
Principal design company: Studio Kim bucsa Diaconu Co.Ltd.;
Beneficiary: AS Concept Co.Ltd., Târgu Mures;

 

(21) 2006     Structural rehabilitation of house no. 325, Rosia Montana, Alba county (building with historic character in the protected area);
IROD M no.: 33/2006 load-bearing structure design; phases: TD+ED and BPD excerpt, (11.2006), finalised, ; execution in progress according to plans; load-bearing structure head designer;
Principal design company: General Game Co.Ltd.; Sântimbru; (327/2006);

 

(20) 2005-    Rehabilitation, refurbishment, modernisation of the Cluj-Napoca Reformed College Building – Kogalniceanu street no. 16, Cluj-Napoca, Cluj county(CJ-II-m-B-07379),
No. 16/2005, Principal design company and load-bearing structure designer;
Phases: full BPD (09.2005) + TD+ED for the kitchen – dining-hall area (10.2005); load-bearing structure head designer; additional act 1-2/2006 TD+ED roof structure rehabilitation (phase 1 12.2006, phase 2: 02.2007); executed to 25%; 2007-2008;
Beneficiary: Reformed Diocese of Transylvania; User beneficiary: Reformed College of Cluj-Napoca;

 

(19) 2005-2008    Architectural and structural retrofitting, extension by mansarding of the main building of the ensemble on Mitropolit Andrei Saguna street no. 1, Alba Iulia; (AB-II-m-B-00147),
No. 21/2005, Principal design company and load-bearing structure designer; phases: BPD (08.2005) + TD+ED (12.2005); load-bearing structure head designer; additional act 1 – re-design 04.2007. – executed, handover: 09.2008.;
Beneficiary: Alba-Iulia Roman-Catholic Archbishopric;

 

(18) 2005    Architectural and structural retrofitting, extension by mansarding of the ARGILLON Romania Co. administrative building, Turda; Cluj county (building with historic character),
No. 22/2005, Principal design company and load-bearing structure designer; phases: BPD+ TD+DE; load-bearing structure head designer; – the works have not been executed;
Beneficiary: ARGILLON Romania Co., Turda

 

(17) 2005    Architectural and structural retrofitting, extension by mansarding of the Geoagiu rectory , Hunedoara county (building with historic character in the protection area of the church and rotunda), No. 25/2005, Principal design company and load-bearing structure designer; phases: BPD (07.2005) and TD+ED (07.2005.); load-bearing structure head designer; – executed in summer 2005-2006;
Beneficiary: Transylvanian Young Men’s Christian Association

 

(15-16) 2005    School Infrastructure Rehabilitation Programme – Urban Schools – Salaj 2005: Structural and architectural retrofitting of the old building of the Simleul Silvaniei Highschool no. 1 (SJ-II-m-B-05122), and the Cehu Silvaniei Highschool (building with historic character), Salaj county, No. 26/2005, phases: FS; (05.2005) TD+ED and BPD excerpt (06-08.2005); load-bearing structure head designer;
Principal design company: CONSARD Proiectare Co.Ltd.. (No. 117-1/2005; 117-2/2005);
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Salaj County School Inspectorate;

 

(14) 2005    Architectural and structural retrofitting, extension by mansarding of the Rascruci Bánffy castle, Cluj county (CJ-II-m-A-07742.01),
No. 20/2005, load-bearing structure design; phase: FS (11.2005); load-bearing structure head designer;
Principal design company: M & M Design Co.Ltd.;
Beneficiary: Cluj County Council;

 

(13) 2005-    Structural rehabilitation of the roof structure of the former synagogoue – Tranzit House / on Baritiu street, Cluj-Napoca (historic building in the protected area),
No. 15/2005, Principal design company and load-bearing structure designer; phase: EI (12.2005), FS (07.2008, updated EI 08.2008); load-bearing structure head designer;
Beneficiary: Tranzit Foundation ; Owner: Cluj-Napoca Jewish Community, Tipografiei street no. 25, Cluj-Napoca; Investor: National Investment Company;

 

(10-12) 2004    School Infrastructure Rehabilitation Programme – Urban Schools – Bihor county (buildings with historic character): Retrofitting and modernisation of the "Constantin Brâncusi" Technological College, Oradea; Retrofitting and modernisation of the "Nicolae Bolcas" Pedagogical Highschool, Beius, Retrofitting and modernisation of the "Unirea" School, building I, Stei, Bihor county;
No. 18/2004; phases FS (10.2004), TD+ED and BPD excerpt (12.2004) – load-bearing structure head designer; executed in 2005-2007;
Principal design company: CONIRO-IMPEX Co.Ltd.. (No. 31-1/2/4/5-2004);
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Bihor County School Inspectorate;

 

(9) 2004    School Infrastructure Rehabilitation Programme – Urban Schools – Cluj county: Repairing the roof structure of the "Nicolae Balcescu" Theoretical Highschool, Cluj-Napoca, (building with historic character in the protected area);
No. 17/2004; – phases FS, TD+ED (11.2004), load-bearing structure head designer;
Principal design company: CONSARD Proiectare Co.Ltd..;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Cluj County School Inspectorate;

 

(8) 2004    Structural and architectural retrofitting of the Károly manor, Carei, judetul Satu Mare (SM-II-a-A-05280.01),
No. 14/2004, load-bearing structure design; phase: FS; load-bearing structure head designer;
Principal design company: FKM Co.Ltd., Cluj;
Beneficiary: Carei Local Council;

 

(7) 2004    Consolidating the roof structure of the Reformed church on Motilor street no. 84, Cluj-Napoca (CJ-II-m-B-07427)
No. 09/2004, Principal design company and load-bearing structure specialist designer; phase: EI (11.2004); load-bearing structure head designer; executed in 2004;
Beneficiary: Reformed Diocese of Transylvania; User beneficiary: Parohia Reformata Nr. 4. Cluj;

 

(6) 2004    Emergency interventions and structural rehabilitation of the Cuzaplac, Salaj county Reformed church (building with historic character)
No. 05/2004, Principal design company and load-bearing structure specialist designer; phase: EI (09.2004); project head and load-bearing structure head designer; executed in 25-25% in 2004 and 2005;
Beneficiary: Cuzaplac Reformed parish, by minister Rácz István;

 

(5) 2004    Consolidation and retrofitting of the Comsesti Unitarian church (Tureni, Cluj county) (building with historic character);
No. 04/2004, Principal design company; phase: EI (07.2004); project head and load-bearing structure head designer; works have not been executed;
Beneficiary: Comsesti Unitarian parish, Cluj-Napoca Unitarian Bishopric;

 

(4) 2004-    Consolidation and partial refurbishment of the Special School for Hearing Disorders no. 2. – Gruia street no. 51, Cluj-Napoca (building with historic character)
No. 08/2004, Principal design company; phases: BPD+TD+ED partially, in 7 phases: 2004, 2005, 2006; 2007 and 2008; project head and load-bearing structure head designer;
Beneficiary: Special School for Hearing Disorders no. 2. – Gruia street no. 51, Cluj-Napoca; public domain of the Cluj county council;

 

(3) 2004    Structural rehabilitation and retrofitting of the Cluj-Napoca Economical Highschool, Kogalniceanu street no. 4., (CJ-II-m-B-07372)
No. 09/2004, load-bearing structure design; phase: EI (05.2004); load-bearing structure head designer; works abandoned;
Principal design company: CONSARD Proiectare Co.Ltd.;

 

(2) 2004    Protection drain for the Tarcesti Unitarian church, Harghita county (building with historic character)
No. 11/2004, load-bearing structure design; phase: EI (09.2004); load-bearing structure head designer; executed in 2005;
Beneficiary: Tarcesti Unitarian parish, Cluj-Napoca Unitarian Bishopric;

 

(1) 2003    Mansarding the Tordai-Soós house, Deva street no. 13., Cluj-Napoca (building with historic character in the protected area)
No. 01/2003, Principal design company; phases: BPD+TD (11.2003, 02.2004) project head and load-bearing structure head designer;
Beneficiary: family of Tordai Soós Kata and Attila

 

Rehabilitation, refurbishment, modernisation and mansarding of the "Majláth Gusztáv" highschool seminary, Alba-Iulia

Attention: open in a new window. PDFPrintE-mail

Last Updated (Monday, 18 January 2016 16:59) Written by Administrator Monday, 28 June 2010 19:58

Technical situation prior to planning - review sheet

Degradation degree:
semi-ruined, advanced state of decay
Type of work:
full TD + ED / studies

Project title:

Rehabilitation, refurbishment, modernisation and mansarding of the "Majláth Gusztáv" highschool seminary, Alba-Iulia

General presentation:

According to plans developed in 2005, the current building system of B+GF+FF would be preserved, hosting administrative offices, a library and accommodation for seminarists (in the first phase, the mansard was planned using the extant space of the roof structure for lodgings.) In the second phase, in 2007, the idea of a mansard was given up, and the building was redesigned to host administrative functions and classrooms. The building originally served as a “Chamber House”, belonging to the group of buildings newly constructed by Austrian military authorities right after moving the garrison into the fortress, and it served the administrative and military structures directly responding to the Treasury. Of the three buildings of the ensemble, plans concentrated on the main one (C2 and C3 remain ruins.)

The construction system:

The building system consists of a partial basement + ground floor + first floor, of a masonry of massive, full bricks, without concrete ring-beams and cores, with brick masonry vaults above the basement and ground floor, and a partially collapsed slab of adjoining beams on over the first floor. Orthogonal load-bearing walls situated at distances of no more than 10m provide appropriate seismic safety; windows are situated at a distance of at least 1.00m from corners. The brick masonry vaults over the basement and ground floor, and the slab of adjoining beams over the first one, partially collapsed, do not constitute a horizontal washer of appropriate rigidity; thus it is necessary to reinforce the whole structure with an LEP slab system over the main rooms of the floor and a reinforced concrete plate over the first floor corridor.

Technical condition and structure of interventions:

The building is in an advanced state of decay; the structure as a whole is in an intermediate state of decay, but with significantly degraded subensembles. Foundations have only suffered building physical degradations, being insufficient only in the case of balustrades on the long side. Load-bearing walls are among the most degraded subensembles, fissured and cracked especially in the areas of corners and around large openings; their degradations are building physical ones. Vaulted slabs are partially fissured, whereas the slab of adjoining beams over the first floor is in an advanced state of biological decay, and partially collapsed. The roof structure is relatively well-preserved, its degradations only requiring local replacements; problems of conception are only present at the trimmer / wall-plate joints and at the intersection of the roofs of the two sides.


E01.JPG

E02.JPG

E03.JPG

E04.JPG

E05.JPG

E06.JPG

E07.JPG

 

The New York Galleries, Cluj-Napoca: building rehabilitation, change of functions, repartition of extant spaces, attic furbishment, facade restoration

Attention: open in a new window. PDFPrintE-mail

Last Updated (Monday, 18 January 2016 16:58) Written by Administrator Tuesday, 06 July 2010 19:14

General data

Initial state

Architecture

Structure

Execution

Finished building

Structural rehabilitation project (emergency interventions)

Type of intervention:
arch. – struct. rehab., revital.
Type of work:
Full TD + ED with studies

Project title:

The New York Galleries, Cluj-Napoca: building rehabilitation, change of functions, repartition of extant spaces, attic furbishment, facade restoration

Extract of interventions designed - Foundation-level interventions

Foundation-level interventions belong to two main groups:

(A) Consolidation of extant foundations:

by underpinning, according to general chart R01 and details R01/7;

(B)New foundations, as described by chart set R01/1- Foundation system for the escalator in area 3-5-C-L, including the construction of isolated rigid foundations for the load bearing structure in the small yard area;

chart set R01/2 – reinforced concrete fire-safety watertank in area 3-4-C-K;

chart set R01/3 - foundation details of the newly constructed wall, axes 2 and H';

chart set R01/4 - details of rigid foundations of stairs, including the construction of rigid local foundations for the stairs;

chart set R01/6 - details of the technical corridor for electrical installations and piping.


R01

R02

R03

R04

R05

Extract of interventions designed - Basement-level interventions

Interventions affect the following structural subensembles: load-bearing walls, slabs and stairs.

R02-dpn - basement layout - synthesis of demolishing non-structural walls, the primary works to be executed following the Demolition Guide;

R02-pp - basement layout - synthesis of structural interventions on load-bearing walls, synthesising structural interventions;

R02-pl - basement layout - synthesis of structural interventions on the slab over the basement.

New subensembles:

R02/1: Reinforced concrete slab over the basement, area 3-5-C-L (small yard), height -0.07;

R02/3: metal stairs 1, area 4-5-A-B, from basement to mezzanine (from height -4.00 to +2.85);

Reinforced concrete slab over the basement, area 4-6-A-B, height -0.34;

R02/5: Reinforced concrete stairs, basement - ground floor, area 10-12-J-M, from height -3.63 to -0.03; Interventions:

R02/2: details of bonding, armature and formworks for cores / backings and girder, stairhead area 2-3-C-H;

R02/6: details of basement load-bearing walls;

R02/7: Details of local interventions on the slab over the basement.


R01

R02

R03

R04

R05

R06

Extract of interventions designed - Ground/Floor-level interventions

Interventions affect the following structural subensembles: load-bearing walls, slabs and stairs.

R03-pp – ground floor layout - synthesis of structural interventions on load-bearing walls;

R03-dpn - ground floor layout - synthesis of demolishing non-structural walls;

R03-pl - ground floor layout - synthesis of structural interventions on the slab over the ground floor;

set R03/1: metal frames structural subensemble in area 3-5-C-L (small yard);

set R03/2 - metal beam and reinforced concrete slab, profiled sheet for the mezzanine, area 1-5/G-O, height +2.86;

set R03/3 - metal stairs 2 - 1-2/N-O from ground floor, h. -0.22 to mezzanine, h. +2.84;

set R03/4 - mezzanine slab, area 4-6-A-B, height +2.85;

set R03/5 - reinforced concrete stairs, area 1-3-C-H’, from ground floor (-0.08) to 3rd floor / mansard (+15.37);

set R03/6 - details of ground floor and mezzanine load-bearing walls;

set R03/7 - reinforced concrete slab in the light well areas.


R01

R02

R03

R04

R05

R06

Extract of interventions designed - interventions on the 1st and 2nd Floor levels

Interventions affect the following:

R04-pp – 1st floor layout - synthesis of structural interventions on load-bearing walls;

R04-dpn – 1st floor layout - synthesis of demolishing non-structural walls;

R04-pl – 1st floor layout - synthesis of structural interventions on the slab over the 1st floor;

set R04/1 – details concerning the 1st floor load-bearing walls;

set R04/2 – local bracing system, axis B, between 3 and 5;

set R04/3 – reinforced concrete slab in the ligthwell areas;

R05-pp – 2nd floor layout - synthesis of structural interventions on load-bearing walls;

R05-dpn – 2nd floor layout - synthesis of demolishing non-structural walls;

R05-dpn – 2nd floor layout - synthesis of structural interventions on the slab over the 2nd floor;

set R05/1 – details concerning the 2nd floor load-bearing walls;

R05/2 – local slab over the light well; set R05/3 – metal stairs from 2nd floor to mansard, area 10-12-C-J, from height +10.66 to +15,53;

set R05/4 – gangway on 2nd floor level, area of axes K-L-6-9, height +10.92;

set R05/5 – reinforced concrete beam slab over the 2nd floor, area 10-12-B-J, height +15.58; R05/6 – slab on reinforced concrete beams lead out at height +15,65.


R01

R02

R03


R01

R02

R03

R04

R05

R06

R07

Extract of interventions designed - Mansard and Roof Structure level

Interventions affect the following structural subensembles: load-bearing walls, slabs, stairs and roof structures.

R06-pp – 3rd floor layout - synthesis of structural interventions on load-bearing walls;

R06-dpn – 3rd floor / mansard layout - synthesis of demolishing non-structural walls;

R06-pl – synthesis of structural interventions on the slab over the mansard;

Set R06/1 – attic café structural subensemble: café slab + café structure, area 10-12-B-J;

Set R06/2 – metal stairs from mansard to café, area of axis 12;

Set R06/3 – reinforced concrete slab over 3rd floor, height +18.75, areas: 1-3-C-N, 3-9-L-N;

Set R06/4 – details concerning the 3rd floor and mansard load-bearing walls.

R07 – Roof structure:

Set R07/1 – Roof of small yard, area 3-5-C-L, height +18.75;

Set R07/2 – Structural interventions on the level of roof. R08 – Typical details.


R01

R02

R03

R04

R05

R06

R07


R01

R02

R03

R04

R05

R06

   

Architectural and structural rehabilitation, mansarding and extending the house on Podul Viilor street no.9, Baia Mare, Maramureş county (in the protected area)

Attention: open in a new window. PDFPrintE-mail

Last Updated (Monday, 18 January 2016 17:00) Written by Administrator Thursday, 08 July 2010 17:01

General data

Initial state

Architecture

Structure

Execution

Finished building

Technical situation prior to planning - review sheet

Degradation degree:
Advanced decay
Type of work:
full TD + ED / studies

Project title:

Architectural and structural rehabilitation, mansarding and extending the house on Podul Viilor street no. 9, Baia Mare, Maramureş county

General data concerning the building - overview:

The building was constructed in several construction phases. It currently has an L-shaped layout, with ground-floor areas without basement. The building proper is developed on two levels: basement + ground-floor, with a mansard roof. Although constructed in at least three phases, the building constitutes a single structural unit. The basic problem arises from the fact that ground-floor load-bearing walls partially lean on the basement vaults, partially on the basement pillars. A significant number of intersections between ground-floor load-bearing walls are not bonded.

The construction system:

is made up of cellular load-bearing masonry. The structure is made up of the following subensembles: foundations; load-bearing walls of, stone, mixed or brick masonry; vaulted slabs with different structural solutions; timber ridge-roof structure. Vertical load-bearing elements are mostly load-bearing walls / diaphragms of quarry-stone masonry (basement), or of mixed, stone-brick masonry, or of old-format full-brick masonry with lime-based mortar (ground-floor), laid out in two orthogonal directions. Slabs are mostly stone masonry vaults or brick ones with lime-based mortar, differing both in types, materials, execution techniques, geometry and discharge method. The roof structure follows the L-shaped layout of the main wing, and has a late baroque structural conformity.

Technical condition and structure of interventions:

The has building been conserved to a degree that is satisfactory for the present, but the extension, mansarding and change of function require certain reinforcement interventions. Load-bearing walls are in an advanced state of decay, being the most decayed structural ensemble. Damages consist in lacks of continuity: fissures, cracks, breaks brought about by different causes (primarily technological ones, the lack of wall bonding). Their moisture level is also high. Slabs are the second most degraded structural subensemble, with a pathology similar to that of the load-bearing walls, the main damages consisting in lacks of continuity: fissures, cracks, breaks. They are also missing a continuous support to the foundations. The roof structure subensemble is relatively well-preserved, but the mansarding will require a set of further interventions.


E01.JPG

E02

E03.JPG

E04.JPG

E05

E06

E08

 

New buildings

Attention: open in a new window. PDFPrintE-mail

Last Updated (Monday, 18 January 2016 16:57) Written by Administrator Sunday, 06 March 2011 17:09

(14) 2008    IROD M CO. LTD. contract no.: 63/2008;
Capacity: load-bearing structure designer; principal design company:  KonZOL Co.Ltd.;
Project title: Company headquarters, showroom and residence, demolition of extant building, connecting the new construction to extant public services, site enclosure
Location: Cluj-Napoca, Romulus Vuia street no. 225;
Beneficiary:  Intramark Co.Ltd.;
Design phases: BPD (12.2008); TD+ED, in progress;
Data concerning the execution phase: –;

 

(13) 2008    IROD M CO. LTD. contract no.: 71/2008;
Capacity: load-bearing structure designer; principal design company:  Westplan Arhitects Co.Ltd.;
Project title: Family house – Pinte family –  Alexandru Borza street no.9
Location: Cluj-Napoca, Alexandru Borza street no.9;
Beneficiary: Mircea PINTE;
Design phases: BPD (09.2008); TD+ED (11.2008);
Data concerning the execution phase: –;

 

(12) 2008    IROD M CO. LTD. contract no.: 65/2008;
Capacity: load-bearing structure designer; principal design company:  Studio K.B.D. Co.Ltd.;
Project title: Single-family dwelling, Feleacu no. 351.
Location: Feleacu no. 351, Cluj county;
Beneficiary: Iulia BRATU;
Design phases: TD+ED, BPD excerpt (08.2008);
Data concerning the execution phase: load-bearing structure executed in11.2008;

 

(11) 2008    IROD M CO. LTD. contract no.: 64/2008;
Capacity: principal design company and load-bearing structure designer; Architectural design:  KonZOL studio Co.Ltd.;
Project title: Sâncraiu sports stadium
Location: Sâncraiu, Cluj county;
Beneficiary: Sâncraiu Mayor’s Office;
Design phases: FS (08.2008); TD+ED, in progress;
Data concerning the execution phase: –;

 

(10) 2008    IROD M CO. LTD. contract no.: 59/2008;
Capacity: load-bearing structure designer; principal design company:  TEKTUM Arhitectura & Arta Co.Ltd.;
Project title: Family house  – fence facing street, enclosure, external furbishing
Location: Cluj-Napoca, Faget district, D.D. Rosca street no nr., Cluj county,
Beneficiary: Gheorghe and Maria MORAR;
Design phases: BPD (04.2008); TD+ED (05.2008);
Data concerning the execution phase: load-bearing structure executed in Octomber 2008;

 

(9) 2006    IROD M CO. LTD. contract no.: 39/2006;
Capacity: load-bearing structure designer; principal design company:  Studio K.B.D. Co.Ltd.;
Project title: Dwelling, Pauleni Ciuc, Main street no. 188, Harghita county;
Location: Pauleni Ciuc, Main street no. 188, Harghita county;
Beneficiary: András Zoltán Family
Design phases: BPD (09.2006); TD+ED (09.2006);
Data concerning the execution phase: investment failed;

 

(8) 2006    IROD M CO. LTD. contract no.: 35/2006;
Capacity: load-bearing structure designer; principal design company: BIA MAKSAY;
Project title: Quarantine-type sheep farm and enclosure, Sic, Cluj county;
Location:  Sic, Cluj county;
Beneficiary: AGROSIC IMPORT EXPORT Co.Ltd.;
Design phases: FS (07.2006); TD+ED, BPD excerpt (02.2007);
Data concerning the execution phase: investment failed;

 

(7) 2006    IROD M CO. LTD. contract no.: 29/2006;
Capacity: load-bearing structure designer; principal design company:  Consard Proiectare Co.Ltd.; (Contract no. 115-5/2006);
Project title: School Infrastructure Rehabilitation Programme - Urban Schools: Package S/SRIP/REP/163 Bihor, "Petofi Sándor" Highschool – Sacuieni, Bihor county – Building B;
Location: the town of Sacuieni, site provided by the local council on Dunarii street no. 59., Bihor county;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre –  Bihor County School Inspectorate / Sacuieni Local Council;
Design phases: TD+ED, BPD excerpt (02.2006);
Data concerning the execution phase: executed and handed over in 2007-2008;

 

(6) 2006    IROD M CO. LTD. contract no.: 28/2006;
Capacity: principal design company and load-bearing structure designer; architectural design: BIA MAKSAY;
Project title: Family home for Jacobson Kinga Noemi and Jacobson Jeffrey Darrell, Eugen Ioneu street no nr., Cluj-Napoca;
Location: Cluj Napoca, Eugen Ioneu street no nr.;
Beneficiary: Jacobson Kinga Noemi and Jacobson Jeffrey Darrell family;
Design phases: TD+ED, BPD excerpt (06.2006);
Data concerning the execution phase: executed and handed over in 2007-2008;

 

(5) 2005    IROD M CO. LTD. contract no.: 12/4//2005;
Capacity: load-bearing structure designer; Principal design company: BIA MAKSAY (contract no. 20-21/2005;
Project title: Facade repairs, dwelling extension, indoor parking and basement pool construction, Cluj-Napoca;
Location: Onisifor Ghibu street no. 13, Cluj-Napoca;
Beneficiary: Szekely Susana and Szekely Tiberiu family;
Design phases: TD+ED, BPD excerpt (08-10.2005);
Data concerning the execution phase: executed and handed over in 2007-2008;

 

(4) 2005    IROD M CO. LTD. contract no.: 27/2005;
Capacity: principal design company and load-bearing structure designer; Architectural design: BIA MAKSAY;
Project title: Extension by partial demolition - family house of Veres Csaba and Ilona, Între Lacuri street no. 43, Cluj-Napoca;
Location: Cluj Napoca, Între Lacuri street no. 43;
Beneficiary familia VERES Csaba and Ilona;
Design phases: BPD (02.2006);
Data concerning the execution phase: works failed due to neighbours refusing consent;

 

(3) 2005    IROD M CO. LTD. contract no.: 24/2005;
Capacity: load-bearing structure partial designer; load-bearing structure designer:  F and M;
Project title: Hall of POLUS Center, Cluj;
Location: POLUS Center, Floresti, Cluj county;
Beneficiary:  POLUS Center;
Design phases: cooperation (02-08.2005);
Data concerning the execution phase: executed and handed over: 2005-2007;

 

(2) 2004-2007    IROD M CO. LTD. contract no.: 13/2004; additional acts 1/2005, 3/2007 (mansarding phase);
Capacity: principal design company and load-bearing structure designer; Architectural design: BIA MAKSAY;
Project title: Dining hall and kitchen for the ”Ady Endre” School, Sâncraiu, Cluj county, with seating 100 persoans, extendable to 150 persoane on the terrace;
Location: Sâncraiu no. 308, Cluj county;
Beneficiary: Sâncraiu Local council, Cluj county; Ady Endre School, Sâncraiu, Cluj county;
Design phases: FS (08.2004), BPD (12.2004), PT phase 1(02.2005), DE phase 1 (04.2005), PT+DE mansarding (phase 2) (08.2007);
Data concerning the execution phase: works in progress, 2006-;

 

(1) 2004    IROD M CO. LTD. contract no.: 18-3/2004;
Capacity: load-bearing structure designer; principal design company:  CONIRO IMPEX Co.Ltd.; (Street no. ctr. 31-3-2004);
Project title: Extending the Alesd, Bihor county school with a new building hosting 12 classrooms;
Location: Soimu  district no. 3., Alesd, Bihor county;
Beneficiary: Ministry of Education and Research – School Rehabilitation Project Management Centre – Bihor County School Inspectorate;
Design phases: FS (10.2004); TD+ED, BPD excerpt (12.2004);
Data concerning the execution phase: executed and handed over: 2005-2007;

   

Page 1 of 10